Starting July 1, 2026, Florida lets homeowners skip the building permit on some smaller projects. It sounds like a break. It's really a narrow door with a low ceiling, and a lot of people are going to smack their head on the frame.
The law is HB 803. Here's who it actually helps, and the exclusions that quietly cancel it for most of the projects people have in mind.
The Short Version
If you own a single-family home, you (or your contractor) don't need a building permit for work valued under $7,500, as long as you file a written request for the exemption with your local building department. That's the whole gift. Now the fine print, because the fine print is where this one lives.
What Actually Qualifies
Cosmetic, non-structural, non-trade work. The stuff that doesn't touch a wire, a pipe, a load-bearing anything, or a gas line:
- Interior painting and drywall finishing
- Flooring and tile (no structural subfloor work)
- Cabinet swaps and countertops that don't move plumbing
- Trim, baseboards, interior doors
Notice what's not on that list. Almost everything expensive.
What's Excluded, and This Is the Part That Bites
The exemption does not apply to any of these, at any dollar amount:
- Electrical work
- Plumbing work
- Mechanical (HVAC) work
- Gas work
- Structural work
These are the trades where bad work floods your neighbor, burns down the block, or drops a ceiling. The state left them fully permitted on purpose. So a $900 water heater? Still needs a permit, because it's plumbing and often gas. Recessed lights in the living room? Electrical. Moving a bathroom sink two feet? Plumbing. The "small job" you're picturing probably lands right back inside the permit rules.
The Flood Zone Line Nobody Reads
If your property sits in a FEMA flood hazard area, the exemption is gone. Doesn't matter if the work is a $300 cosmetic touch-up. Big stretches of coastal Florida are in flood zones, so for a lot of homeowners this single line erases the whole benefit.
You Can't Chop a Big Job Into Little Ones
HB 803 flatly bans splitting one project into multiple sub-$7,500 pieces to duck the threshold. A $12,000 renovation invoiced as two $6,000 jobs isn't clever. It's the exact move the statute names and prohibits. Building officials have watched that trick for decades.
"No Permit" Still Means "Yes Code"
This one trips people up hard. The exemption removes the paperwork, not the Florida Building Code. Your work still has to meet code. And unpermitted work has a long memory: it can surface when you sell (disclosure), when an inspector spots it, or when an insurer denies a claim because the improvement was never on record. We wrote a whole homeowner's guide to Florida building permits on why that paper trail matters more than the fee ever did.
One Thing HB 803 Doesn't Touch: Who Needs a License
Skipping a permit is not the same as skipping a licensed contractor. Florida still requires a state-licensed contractor for most work over $2,500. HB 803 changed permits, nothing else. If someone waves this new law around to justify doing your electrical panel unlicensed and unpermitted, they're wrong twice over, and hiring unlicensed in Florida carries real consequences.
So Who Actually Benefits?
Honestly? Someone doing pure cosmetic work, on a single-family home, outside a flood zone, under $7,500, who files the written request. Painting. New floors. A cabinet refresh. For that homeowner it's a real time-saver. For everyone with a project that touches a trade, which is most actual remodels, nothing changed. You still need a permit and a licensed pro.
Not sure which bucket your project falls in? The safe move is also the cheap one: confirm the contractor's license before you hand over a deposit. Verify any Florida contractor in about a minute, or get matched with licensed pros who pull the right permits without being asked.
Frequently Asked Questions
Do I need a permit to paint or replace flooring in Florida now? For a single-family home outside a flood zone, purely cosmetic work under $7,500 can be exempt once you file the written request. Painting and standard flooring usually qualify. Anything structural under the floor does not.
Can I replace my water heater without a permit under this law? No. Water heaters are plumbing, and gas units add gas work. Both are excluded from the exemption, so a permit is still required no matter the price.
What about adding recessed lights or an outlet? That's electrical, which is excluded. Still needs a permit and a licensed electrician.
Does the exemption cover condos, townhomes, or rentals? The law is written for single-family dwellings. If you're not in a single-family home, don't assume it applies. Ask your building department first.
Do I still have to hire a licensed contractor for exempt work? HB 803 only removes the permit. It doesn't change licensing. Work over $2,500 can still require a state-licensed contractor depending on the trade.
When does it start? July 1, 2026.
Related
Ready to hire?
Hire a Licensed Contractor in Florida
Tell us about your project and we'll match you with up to 3 verified, licensed contractors — within 24 hours.
Free, no obligation. Takes about 30 seconds.
Free Guide
The Florida Homeowner's Guide to Hiring a Contractor
Everything you need to know before hiring — how to verify a license, red flags to watch for, what questions to ask, and how to protect yourself from fraud. Unsubscribe anytime.
By submitting, you consent to receive an email from FloridaContractorCheck.com with your free guide. We won't spam you — one guide, that's it. See our Privacy Policy and Terms of Service.